Skip to main content

Breadcrumb

  1. Back to site
  2. Connections
  3. View Publication Categories

Connections

OSC Trip Information 2017-18 Dec 17

  • Read more about OSC Trip Information 2017-18 Dec 17
OSC Trip Information 2017-18 Dec 17
Connections
Generation

AS-OSC-Report-Dec2017

  • Read more about AS-OSC-Report-Dec2017
AS-OSC-Report-Dec2017
Connections
Generation

Minutes SONI GCRP-April 2017 (final))

  • Read more about Minutes SONI GCRP-April 2017 (final))
Minutes SONI GCRP-April 2017 (final))
Connections

Minutes SONI GCRP- September 2017 (final)

  • Read more about Minutes SONI GCRP- September 2017 (final)
Minutes SONI GCRP- September 2017 (final)
Connections

Auction Timetable 2018

  • Read more about Auction Timetable 2018
Auction Timetable 2018
Connections

SONI letter to UR-Over-installed Units

  • Read more about SONI letter to UR-Over-installed Units
SONI letter to UR-Over-installed Units
Connections

SONI-Marked Up DS3 System Services Regulated Arrangements Agreement-DRAFT

  • Read more about SONI-Marked Up DS3 System Services Regulated Arrangements Agreement-DRAFT
SONI-Marked Up DS3 System Services Regulated Arrangements Agreement-DRAFT
Connections
Generation

SONI-Grid-Code-ISEM-Mod-Proposal-final-Redline-against-approved-version

  • Read more about SONI-Grid-Code-ISEM-Mod-Proposal-final-Redline-against-approved-version
SONI-Grid-Code-ISEM-Mod-Proposal-final-Redline-against-approved-version
Connections

2017-11-14 SONI Solar PPM Settings Schedule

  • Read more about 2017-11-14 SONI Solar PPM Settings Schedule
2017-11-14 SONI Solar PPM Settings Schedule
Connections

2017-08-11 L TH to Approval of Grid Code Modification to Facilitate System Operations within ISEM

  • Read more about 2017-08-11 L TH to Approval of Grid Code Modification to Facilitate System Operations within ISEM
2017-08-11 L TH to Approval of Grid Code Modification to Facilitate System Operations within ISEM
Connections

Pagination

  • Previous page
  • Current page 6
  • Next page
Subscribe to Connections