Mid Antrim Upgrade - Needs Report
This document presents the case of need for reinforcing the 110 kV network in the Mid Antrim area.
Mid Antrim Upgrade - Environmental Report
This document presents the work carried out by our environmental experts in relation to the options for the Mid Antrim Upgrade project. An environmental constraint modelling exercise was carried out to inform on the various constraints each option could encounter within the study area. SONI has used this information to inform our Preliminary Preferred Options report.
SONI Transmission Outage Summary 2021 (Week 37-38)
Summary of the SONI Transmission Outages over the next two weeks
SONI Transmission Outage Summary 2021 (Week 36-37)
Summary of the SONI Transmission Outages over the next two weeks
SONI Transmission Outage Summary 2021 (Week 35-36)
Summary of SONI Transmission Outages over the next two weeks
SONI Transmission Outage Summary 2021 (Week 34-35)
Summary of the SONI Transmission Outages over the next two weeks
SONI Transmission Outage Summary 2021 (Week 33-34)
Summary of the SONI Transmission Outages over the next two weeks
Quarterly Imperfections Cost Report Apr – Jun 2021
Quarterly update of factors affecting Imperfections costs.
SONI Transmission Outage Summary 2021 (Week 32-33)
Summary of Transmission Outages over the next two weeks