SONI Transmission Outage Summary 2020 (Week 07-08)
Update of planned transmission outages across the Northern Ireland network.
LFCBOA for the IE and NI Synchronous Area
EirGrid TSO & SONI TSO final versions of the Synchronous Area Operational Agreement and the Load Frequency Control Block Operational Agreement (in accordance with Articles 118(2) and 119(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation)
LFCBOA for the IE and NI Synchronous Area
EirGrid TSO & SONI TSO final versions of the Synchronous Area Operational Agreement and the Load Frequency Control Block Operational Agreement (in accordance with Articles 118(2) and 119(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation)
SAOA for the IE and NI Synchronous Area
EirGrid TSO & SONI TSO final versions of the Synchronous Area Operational Agreement and the Load Frequency Control Block Operational Agreement (in accordance with Articles 118(2) and 119(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation)
Guide to NIE Networks Transmission Equipment Maintenance
A high level guide to the processes and procedures used by Northern Ireland Electricity Networks (NIE Networks) in relation to the maintenance of transmission outturn availability connection assets.
Controllability Status Update - January 2020
Three level hierarchy classification for wind farms
SONI Transmission Outage Summary 2020 (Week 06-07)
Update of planned transmission outages across the Northern Ireland network.
Quarterly Imperfections Cost Report Oct – Dec 2019
Quarterly update of factors affecting Imperfections costs.
Operational Constraints Update
Monthly update of all island system constraints
Kells Cluster Project Brochure - Winter 2020
Kells Cluster Project Brochure - Winter 2020