SONI Transmission Outage Summary 2021 (Week 39-40)
Summary of the SONI Transmission Outages over the next two weeks
SONI Transmission Outage Summary 2021 (Week 38-39)
Summary of the SONI Transmission Outages over the next two weeks
Connections Register – 7th September 2021
SONI Connections Register as of 7th September 2021. (Published in compliance with PC6.4.1. of the SONI Grid Code)
Approved 2021/2022 Generator Transmission Use of System (GTUoS) Tariffs Accompanying Note
Approved 2021/2022 Generator Transmission Use of System (GTUoS) Tariffs Accompanying Note
Mid Antrim Upgrade - Preliminary Preferred Options Report
This document presents SONI’s preliminary preferred option which will be used in our TNPP submission to the Utility Regulator.
Mid Antrim Upgrade - Needs Report
This document presents the case of need for reinforcing the 110 kV network in the Mid Antrim area.
Mid Antrim Upgrade - Environmental Report
This document presents the work carried out by our environmental experts in relation to the options for the Mid Antrim Upgrade project. An environmental constraint modelling exercise was carried out to inform on the various constraints each option could encounter within the study area. SONI has used this information to inform our Preliminary Preferred Options report.
SONI Transmission Outage Summary 2021 (Week 37-38)
Summary of the SONI Transmission Outages over the next two weeks