Annual Renewable Dispatch Down (Constraint and Curtailment) Report 2020
Annual Renewable Dispatch down (Constraint and Curtailment) Report for Ireland and Northern Ireland 2020
SONI Transmission Outage Summary 2021 (Week 22-23)
Summary of the SONI transmission outages over the next two weeks
Operational Constraints Update – May 2021
Monthly update of all island system constraints
Connections Register – 10th May 2021
The following document provides information on the current connections in Northern Ireland which are connected to the Transmission System, operated by SONI or have submitted an effective and valid application seeking a connection to the Transmission System. In addition the document also provides information on current connections in Northern Ireland which are connected to the Distribution System that has entered into a Generator TUoS Agreement with SONI or has applied to SONI for a generator TUoS Agreement.
SONI Transmission Outage Summary 2021 (Week 21-22)
Summary of the SONI transmission outages over the next two weeks
DS3 System Services Regulated Arrangements Gate 4 - Procurement Summary
DS3 System Services Regulated Arrangements Gate 4 - Procurement Summary
DS3 System Services Regulated Arrangements Awarded Contracts Gate 4 - Northern Ireland
DS3 System Services Regulated Arrangements Awarded Contracts Gate 4 - Northern Ireland
Controllability Status Update - August 2020
Three level hierarchy classification for wind farms
Quarterly Imperfections Cost Report Jan – Mar 2021
Quarterly update of factors affecting Imperfections costs
SONI Transmission Outage Summary 2021 (Week 20-21)
Summary of the SONI transmission outages over the next two weeks