Scheduling and Dispatch 2022 and 2023 ToR and Consultation Report
This document describes the Terms of Reference (ToR) for the annual audit of the Scheduling and Dispatch process as to be implemented during the 2022 and 2023 audit periods. Its publication follows a public consultation on the proposed scope. Consultation responses are published above.
S2-LFC-Block-Operational-Agreement-for-Ireland-and-Northern-Ireland-29.09.2022-(post-Title-2-approval)
GL requires that TSOs of each synchronous area responsible for operating load frequency control and reserves, which for Ireland is EirGrid, and for Northern Ireland is SONI, should develop SAOA and LFCBOA. The SAOA and LFCBOA are contained in two respective documents with text relative to the legal articles.
S1-SAOA-for-the-Ireland-and-Northern-Ireland-Synchronous-area-29.09.2022 (post Title 2 approval)
GL requires that TSOs of each synchronous area responsible for operating load frequency control and reserves, which for Ireland is EirGrid, and for Northern Ireland is SONI, should develop SAOA and LFCBOA. The SAOA and LFCBOA are contained in two respective documents with text relative to the legal articles.