S2-LFC-Block-Operational-Agreement-for-Ireland-and-Northern-Ireland-29.09.2022-(post-Title-2-approval)
GL requires that TSOs of each synchronous area responsible for operating load frequency control and reserves, which for Ireland is EirGrid, and for Northern Ireland is SONI, should develop SAOA and LFCBOA. The SAOA and LFCBOA are contained in two respective documents with text relative to the legal articles.
S1-SAOA-for-the-Ireland-and-Northern-Ireland-Synchronous-area-29.09.2022 (post Title 2 approval)
GL requires that TSOs of each synchronous area responsible for operating load frequency control and reserves, which for Ireland is EirGrid, and for Northern Ireland is SONI, should develop SAOA and LFCBOA. The SAOA and LFCBOA are contained in two respective documents with text relative to the legal articles.