System Margins Outlook Report 23.06
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.
2022-2023 Imperfections Mid-Year Report V3.0
EirGrid and SONI are Transmission System Operators (TSOs). In this role, we take actions to ensure supply of power and system security to customers across the system in real time. The cost of these actions is known as the imperfections costs. We pay for these via the revenue we get from suppliers through the Imperfections Charges. The purpose of this report is to describe the analysis undertaken by the TSOs mid-way though the 2022/23 Tariff Year, analysing the imperfections costs against the revenue recovered for same.
System Margins Outlook Report 19.06
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.
Historical Monthly & Quarterly DD Summary Report
Historical Monthly & Quarterly DD Summary Report
Wind Dispatch Down 2011 to Date
Historical Wind Dispatch Down (Constraint and Curtailment) Percentages in Northern Ireland and Ireland
SONI Transmission Outage Summary 2023 (Week 25/26)
Summary of the SONI Transmission Outages over the next two weeks
Proposed 2023/24 Transmission Loss Adjustment Factors (TLAFs) Accompanying Note
This explanatory paper has been prepared by the Transmission System Operators (TSOs) to accompany the proposed Transmission Loss Adjustment Factors (TLAFs) which have been calculated by the TSOs, based on the approved TLAF methodology (SEM-12-049), for 2023/24 (1st October 2023 to 30th September 2024). TLAFs for interconnectors under the revised SEM arrangements are detailed in the I-SEM Interconnector Losses Information Paper published 2nd June 2017.
2023/24 Proposed TLAFs Excel Version
Proposed Transmission Loss Adjustment Factors (TLAFs) which have been calculated by the TSOs, based on the approved TLAF methodology (SEM-12-049), for 2023/24 (1st October 2023 to 30th September 2024). TLAFs for interconnectors under the revised SEM arrangements are detailed in the I-SEM Interconnector Losses Information Paper published 2nd June 2017.