SONI Transmission Outage Summary 2023 (Week 23-24)
The next two weeks of transmission outages
Mid-Antrim Upgrade Citizen Sounding Board: Interim Report
The Mid Antrim Upgrade Citizen Sounding Board is a group of 24 residence selected at random from the area in which the Mid Antrim Upgrade is proposed. It met for two days on Saturday 3 and Sunday 4 December 2022, in the Bank, Portglenone. During those meetings, the 24 members discussed their values, hopes, concerns and aspirations for the Mid Antrim upgrade. This report provides a summary of those meetings and their outputs.
Demand Side Unit System Operator Interface Agreement Consultation Paper - May 2023
​Demand Side Unit System Operator Interface Agreement consultation paper.
System Margins Outlook Report 29.05
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.
SONI Transmission Outage Summary 2023 (Week 22-23)
The next two weeks of transmission outages
System Margins Outlook Report 26.05
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.
System Margins Outlook Report 22.05
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.
SONI Transmission Outage Summary 2023 (Week 21-22)
The next two weeks of transmission outages
System Margins Outlook Report 19.05
The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.