Systems Margin Outlook Report 04/11

The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle. Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.

Report on Utility Regulator Consultation on Transmission Development Plan Northern Ireland - 2021 – 2030

The Transmission Development Plan Northern Ireland(TDPNI) sets out the transmission projects we are developing or intending to develop for the period of the Plan. It also contains information about the needs and drivers of the projects. The projects are integral to ensuring an adequate transmission network is in place. The TDPNI forms part of SONI’s statutory and licence obligations.

Systems Margin Outlook Report 01/11

The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle. Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.

System Margins Outlook Report 28/10

The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.