S1-SAOA-for-the-Ireland-and-Northern-Ireland-Synchronous-area-29.09.2022 (post Title 2 approval)
GL requires that TSOs of each synchronous area responsible for operating load frequency control and reserves, which for Ireland is EirGrid, and for Northern Ireland is SONI, should develop SAOA and LFCBOA. The SAOA and LFCBOA are contained in two respective documents with text relative to the legal articles.
SONI Transmission Outage Summary 2022 (Week 41-42)
Summary of the SONI Transmission Outages over the next two weeks
Connections Register - 5 October 2022 (excel)
Updated documents with updated information to fulfil requirement under Grid Code PC6.4.1
Connections Register - 5 October 2022 (pdf)
Updated documents with updated information to fulfil requirement under Grid Code PC6.4.1
SONI Transmission Outage Summary 2022 (Week 40-41)
Summary of the SONI Transmission Outages over the next two weeks
AS OSC Report August 2022
This report contains a monthly breakdown of the Ancillary Services & Other System Charges for the 2021/2022 tariff year.
All-Island Generation Capacity Statement 2022-2031
This document incorporates the Generation Capacity Report for Ireland and the Generation Capacity Statement for Northern Ireland.