Scheduling and Dispatch 2022 and 2023 ToR and Consultation Report

​This document describes the Terms of Reference (ToR) for the annual audit of the Scheduling and Dispatch process as to be implemented during the 2022 and 2023 audit periods. Its publication follows a public consultation on the proposed scope. Consultation responses are published above.

SOEF Operations - Synchronous Condenser Grid Code Implementation Note

This Implementation Note has been written by SONI and EirGrid to offer guidance to those planning to connect Synchronous Condensers Units (SCU) in order to provide system services within Northern Ireland and Ireland, specifically in relation to the application of Grid Codes within both jurisdictions.

S2-LFC-Block-Operational-Agreement-for-Ireland-and-Northern-Ireland-29.09.2022-(post-Title-2-approval)

GL requires that TSOs of each synchronous area responsible for operating load frequency control and reserves, which for Ireland is EirGrid, and for Northern Ireland is SONI, should develop SAOA and LFCBOA. The SAOA and LFCBOA are contained in two respective documents with text relative to the legal articles.